Timeline

Your idea is just the beginning. How can we help you?
Learn about our process

Our approach is based on HOAI – the German system of design rules and stages for architects and engineers.

1
Initial assessment
  • consultation and mentoring,
  • understanding needs and requirements,
  • Functional-Use Program (FUP),
  • architectural and functional audit,
  • safety audit ( fire protection
  • compliance with technical conditions),
  • design strategy,
  • investment schedule,
  • analysis of project plots - potential and limitations,
  • map for design purposes,
  • soil surveys,
  • SWOT analysis,
  • macroeconomic and microeconomic analysis,
  • examination of the existing building condition, demolition plan,
  • analysis of the investment area's communication,
  • economic advice and sustainable development of the investment,
  • communication with local authorities and other
  • experts to ensure compliance with specific
  • legal provisions of the local spatial development plan/development conditions and
  • technical conditions,
  • definition of the project budget.

Result:


Preliminary concept outline. Programming the project scope,
its objectives and feasibility, investment budget, and SWOT analysis.

2
Preliminary Design
  • First sketches and diagrams reflecting the client's needs, site conditions, and applicable legal regulations,
  • Architectural Concept,
  • Functional and Spatial Layout - Facility Zoning,
  • Urban Layout,
  • Approximate Dimensions, Usable Areas, Facility Parameters,
  • Selection of Appropriate Design Solutions, Analysis of Various Design Options and Scenarios,
  • Consultations and Agreements with the Client,
  • Concept Visualization,
  • VR Presentation,
  • 3D Animations (Concept Film from the 3D Model),
  • VR Sauna Test.

Result:


Concept design that presents a clear vision of the facility's functional layout and estimated implementation costs based on cost per square meter calculations.

3
Concept refinement
  • Development of detailed design solutions,
  • Integration of industry-specific data: structure, electrical, plumbing, lighting, roads,
  • Updating estimated construction costs based on cost-per-square-meter calculations,
  • Preparation of design drawings and other documents showing the materials and construction solutions used,

Result:

A detailed preliminary design that meets legal requirements, along with updated construction costs based on cost-per-square-meter calculations. The design forms the basis for further work on a comprehensive construction design.

4
Construction Design
  • land development design
  • architectural and construction design
  • technical design

Result:

 

Documentation required to obtain a PnB decision.

5
Execution Design
  • Detailed Construction Design,
  • STWIORB – Technical Specification for the Execution and Acceptance of Construction Works, contains information on:
    • Requirements for the method of execution of works,
    • Properties of construction materials,
    • Methods for assessing the correctness of the execution of works,
    • Criteria for acceptance of works.
  • Detailed designs for the primary disciplines:
    • architecture,
    • sanitation,
    • construction,
    • electrical,
    • road.
  • Designs for additional disciplines:
    • acoustics,
    • lighting,
    • hydraulic engineering.
  • Bill of quantities,
  • Creation of an investor's cost estimate.

Result:

 

Detailed construction design, supplemented with STWIORB technical specifications, bills of quantities, and an investor's cost estimate.

6
Preparation of tender documentation
  • Division of responsibilities of individual General Contractors, along with the allocation of necessary documents for conducting the tender procedure (drawings, specifications, bills of quantities, etc.).
  • Possibility of phasing the investment, taking into account requirements related to facility accessibility during subsequent stages.
  • For the purpose of obtaining funding, development of zoning of project areas linked to appropriate financing sources.
  • Participation in market consultations as a consultant/specialist/advisor on the Client's side.

Result:

 

Complete tender documentation tailored to the Investor's requirements was prepared, including division of responsibilities of Contractors, zoning of areas for subsidy, and expert support in market consultations.

7
Participation in tender procedures
  • Advice during the tender phase,
  • Providing tender responses regarding documentation, design assumptions, and material solutions,
  • Confirming the equivalence of materials and procedures.
  • Serving as a member of the tender committee/judge.

Result:

 

The investor selects the most advantageous offer consistent with the design documentation.

8
Design Supervision
  • confirming the compliance of the construction work with the design during the execution of the works,
  • agreeing on the possibility of introducing alternative solutions
  • to those specified in the design, as requested by the construction manager or the investor's supervision inspector.

Result:

 

A properly executed construction process that met the client's expectations in terms of quality and compliance with design documentation.

9
Facility Management
  • Consulting on effective facility management,
  • Energy efficiency optimization,
  • Post-construction evaluation of the facility,
  • Investor support in relations with technical services and users,
  • Media support - competitions, promotion in social media, trade fairs, conferences, etc.
  • Event organization - TKHolding Cup,
  • Consulting and support in the expansion and modernization of the facility.

Result:


Investor support throughout the facility's operation, optimized operating costs, and full utilization of the facility's functionality.